So with the heavy check almost completed, maintnenace puts a new set of props on the aircraft #1 engine.
This aircraft is scheduled to return to service on 04 Nov. The #2 engine in the back awaits her new engine and set of props as well. After this, time for a run up and check out.
No comments:
Post a Comment